C_TS422_1909 Pre-Exam Practice Tests | (Updated 91 Questions)
Valid C_TS422_1909 Exam Q&A PDF - One Year Free Update
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
NEW QUESTION 25
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?
- A. Goods receipt processing time
- B. Minimum wait time
- C. Production time
- D. Queue time
Answer: D
NEW QUESTION 26
What are some of the advantages of using Kanban?
There are 2 correct answers to this question.
Response:
- A. Replenishments are created close to the actual need
- B. It is a simplified form of production control
- C. Replenishments are based on centralized planning
- D. It is mostly accomplished by manual postings
Answer: A,B
NEW QUESTION 27
Which automotive-specific functionality is embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Enhanced Kanban Processing
- B. Enhanced characteristics based processes
- C. Parts interchangeability
- D. Packaging Logistics
- E. Equipment and Tools Management
Answer: A,C,D
NEW QUESTION 28
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Mixed MRP indicator
- B. Individual/Collective Indicator
- C. Dependent Requirements indicator
- D. Storage Location MRP Indicator
Answer: A
NEW QUESTION 29
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Consumption-based planning
- B. Manual planning without check
- C. Forecast planning
- D. Material requirements planning
Answer: A
NEW QUESTION 30
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan?
There are 3 correct answers to this question.
Response:
- A. Use a bucket-oriented capacity check
- B. Use DS heuristic "Schedule Sequence"
- C. Use optimization with respect to set-up times
- D. Use rescheduling with an alternative mode
- E. Use multilevel MRP run for the products on the resource
Answer: B,C,D
NEW QUESTION 31
What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Response:
- A. Full
- B. In use
- C. Empty
- D. Wait
Answer: A
NEW QUESTION 32
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question.
Response:
- A. Sort
- B. Forecast
- C. Scheduling
- D. Filters
- E. Drilldown
Answer: A,D,E
NEW QUESTION 33
What is the correct sequence of the following Activate methodology phases?
Please choose the correct answer.
Response:
- A. Validate, Realize, Test , Deploy
- B. Prepare, Realize, Iterate, Continuous Improvement
- C. Prepare, Explore, Realize, Deploy
- D. Prepare, Validate, Test, Go-Live
Answer: C
NEW QUESTION 34
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP C/4HANA
- B. SAP Field glass
- C. SAP Ariba
- D. SAP Concur
- E. SAP SuccessFactors
Answer: B,C,D
NEW QUESTION 35
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Reduce the planning window.
- B. Form optimum sequences to reduce setup times.
- C. Select an alternative mode on a resource.
- D. Execute a new production planning run.
- E. Adjust the available capacity.
Answer: B,C,E
NEW QUESTION 36
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
Response:
- A. Production Version
- B. Engineering Change Record
- C. Bill of Material
- D. Routing
Answer: A,C,D
NEW QUESTION 37
During production order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Alphanumeric or quota arrangement
- B. Planned order or material number
- C. Lot size or material cost
- D. Validity period or sales order
Answer: A
NEW QUESTION 38
What is the first step in the MRP run?
Please choose the correct answer.
Response:
- A. BOM explosion
- B. Source determination
- C. Net requirements calculation
- D. Lot size calculation
Answer: C
NEW QUESTION 39
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Planning with final assembly (40)
- B. Make-to-order production (20)
- C. Make-to-stock production (10)
- D. Planning without final assembly (50)
Answer: A
NEW QUESTION 40
Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:
- A. Production version
- B. Production scheduling profile
- C. MRP profile
- D. Material master
Answer: D
NEW QUESTION 41
......
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Free Update Certification Sample Questions: https://itcert-online.newpassleader.com/SAP/C_TS422_1909-exam-preparation-materials.html