NEW QUESTION # 16
Which three features are part of Oracle Fusion Functional Setup Manager?
- A. export and import services for setup data migration between environments
- B. guided task list for end-to-end setup requirements
- C. modifying an existing implementation project task list by selecting more functional areas when needed
- D. updating an implementation project task list by changing the opt-in configuration to suit the latest requirements
- E. feature opt-in for a best fit configuration
Answer: A
Explanation:
https://docs.oracle.com/en/cloud/saas/applications-common/r13-update17d/oafsm/applications-cloud-using-functional-setup-manager.pdf Functional Setup Manager offers the following:
*Standardized application configuration and setup experience
*Feature opt-in for a best fit configuration
*xible processes for managing setup:
*Setup by functional areas for an adopt-as-you-go approach
*Implementation projects to manage setup
*Upload file to enter setup data in bulk
* Guided task list for end-to-end setup requirements
* Export and import services for setup data migration between environments
* Comprehensive reporting on setup data
NEW QUESTION # 17
Which two privileges are assigned to the Project Plan Management duty in Security Reference Implementation?
- A. Transfer Project
- B. View Project Progress
- C. Manage Project Plan Resource Assignment
- D. Allocate Project Expense
Answer: C
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapjm/index.html#_Toc468200732_1_12 Topic - Privileges - This table lists privileges granted to duties of the abstract role Project Management Duty.
Granted Role - Project Plan Management
Privilege - only A and C are listed
NEW QUESTION # 18
Your company uses an accounting calendar with periods that are identical to calendar months. A contract resource has been identified to work for six months on an accounting close cycle project. The resource is planned to start with 10 days left in the first period and to end 20 days into the last period. For the remaining periods, the resource must be loaded on all working days of the month. You are required to distribute the budget, forecast, and planning amounts across periods based on the task duration.
Which predefined spread curve must be used to meet this requirement? (Choose the best answer.)
- A. Bell Curve
- B. Daily Spread Basis
- C. S-Curve
- D. Even
- E. Back Loaded
Answer: E
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-control-configuration-manage-spread-curves.html#OAPFM79760 Predefined Spread Curves Name Description Dist. Factors Even Linear distribution of financial or project plan values across periods.
10-10-10-10-10-10-10-10-10-10
Prorated Even
Linear distribution of financial or project plan values across periods, with an exception of the first period and last period in the financial plan. Financial or project plan values for the first period and last period are prorated based on the number of days in the period.
10-10-10-10-10-10-10-10-10-10
Back Loaded
Back-loaded distribution of financial or project plan values across periods. Assigned amounts increase over succeeding periods.
0-5-10-15-20-25-30-35-40-45
Front Loaded
Front-loaded distribution of financial or project plan values across periods. Assigned amounts decrease over succeeding periods.
45-40-35-30-25-20-15-10-5-0
S Curve
S-shaped distribution of financial or project plan values across periods.
18-10-8-10-15-17-18-17-15-8
Bell Curve
Bell-shaped distribution of financial or project plan values across periods. Assignment of plan values is highest in the middle periods.
0-4-10-12-14-12-10-4-0-0
Daily Spread Analysis
Spread is based upon the number of days in each financial period throughout the duration of the task assignment. Amounts are proportionally distributed throughout all periods for the duration of the task assignment None
NEW QUESTION # 19
Green House Corporation has decided to enable the budgetary control feature for their projects. At which two levels will they be able to enter the amounts in the budget versions for these projects?
- A. Expenditure Type
- B. Expenditure Category
- C. Task
- D. Project
- E. Top resource
Answer: A
Explanation:
Budgetary control is a feature that allows you to monitor and control project costs against approved budgets. You can enter the amounts in the budget versions for these projects at two levels: Task and Project. These levels correspond to the budgetary control levels that are defined for the project type. You can also view and compare the budget amounts and actual costs at these levels using reports and dashboards. Expenditure Type, Top Resource, and Expenditure Category are not levels at which you can enter the amounts in the budget versions for these projects. These are attributes that can be used to group and filter the budget and actual amounts for reporting purposes. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-budgets-and-forecasts.html#OAPFM2356191
NEW QUESTION # 20
Which two statements are true about the cross-charge method, Borrowed and Lent?
- A. You must set up the contract business unit to use this method.
- B. Costs or revenue are shared based on transfer price rules with this method.
- C. This method creates accounting entries that move an amount equal to the transfer price between the provider and receiver organizations within a legal entity.
- D. This method creates a formal internal invoice.
Answer: C
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjc/process-project-cost-transactions.html#OAPJC284872 What,s a borrowed and lent processing method?
A method of processing cross-charge transactions that generates accounting entries to share revenue or transfer costs from the provider organization to the receiver organization within a legal entity. An internal invoice isn,t created but costs or revenue are shared based on the transfer price rules. This method provides a financial view of the performance of an organization.
NEW QUESTION # 21
Which two statements are true about a project in "Draft" status?
- A. Project managers can neither view draft projects on the Project Manager Dashboard nor use the projects for requirements planning.
- B. Project managers can view draft projects on the Project Manager Dashboard and use the projects for requirements planning.
- C. Team members cannot see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
- D. Team members can see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
Answer: B
Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPEM/OAPEM1122096.htm The following table lists the project statuses and what you can do with projects in that status.
Project Status
What you can do?
Draft
Project managers can view draft projects in the Project Manager Dashboard and use the projects for requirements planning.
Team members can,t see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
Active
Project managers can view active projects in the Project Manager Dashboard and use the projects for requirements planning, project execution, and reporting.
Team members can view task assignments on active projects on the Team Member Dashboard and My Work area.
Pending Close
Project managers can view pending projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
Team members can view task assignments on pending projects on the Team Member Dashboard and My Work area.
Submitted
Project managers can view submitted projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
Team members can view task assignments on submitted projects on the Team Member Dashboard and My Work area Closed Project managers can,t view closed projects in the Project Manager Dashboard or use the projects for requirements planning, project execution, and reporting.
Team members can,t view tasks of closed projects on the Team Member Dashboard or in the My Work area.
NEW QUESTION # 22
Your client is involved in automation control systems installation. Over the years, they have analyzed their total project spend on specific resource classes. They have identified that their cost spread distribution factor on a 10 spread point scale resembles:
0-4-10-11-14-13-10-4-0-0. Identify two ways to handle this kind of a spread on their budgets and forecasts. (Choose two)
- A. Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to a project template.
- B. Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to the resource class.
- C. Use the predefined Bell Curve spread with small deviations on the spread points.
- D. Use the predefined S-Curve spread with small deviations on the spread points.
Answer: C
Explanation:
To handle a custom spread on budgets and forecasts, you can either create a new spread curve or edit an existing one to match the desired spread points. Then, you can attach the spread curve to a project template or a resource class, depending on whether you want to apply it to all projects using that template or all transactions using that resource class. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/define-project-budgets-and-forecasts.html#OAPFM2355819
NEW QUESTION # 23
Which three setups can be configured by using Rapid Implementation for Project Financial Management Applications?
- A. Project Templates
- B. Work Type
- C. Expenditure Types
- D. Project Types
- E. Project Class Categories
Answer: C
Explanation:
Rapid Implementation for Project Financial Management Applications allows you to configure some common setups for project costing and billing using predefined templates and spreadsheets. Some of the setups that can be configured using Rapid Implementation are expenditure types, project templates, and project types. Work types and project class categories are not part of Rapid Implementation. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/implement-project-financial-management-applications.html#OAPFM2355871
NEW QUESTION # 24
Which two privileges are assigned to the Project Plan Management duty in Security Reference Implementation?
Response:
- A. View Project Progress
- B. Manage Project Plan Resource Assignment
- C. Allocate Project Expense
- D. Transfer Project
Answer: B,D
NEW QUESTION # 25
You have a small project for a period of five months. Your budget amount for each month is spread evenly and is $1000 per month. The first month actual expense is $800 and there is a commitment for $600. Now you generate a forecast at the beginning of the second month. Identify the monthly Estimate-To-Complete (ETC) amount that the application would calculate for the remaining four periods, when the ETC generation method includes commitments. (Choose the best answer.)
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
Explanation:
Budget 5,000 Actuals 800 Commitment 600
ETC = Budget - Actuals - Commitment
ETC = 5,000-800-600 = 3,600 Budget available for next 4 months = 3,600/4 = 900/month
NEW QUESTION # 26
Identify the valid approval group type applicable to Oracle Project Financial Management Cloud. (Choose the best answer.)
- A. Position
- B. Dynamic
- C. Job
- D. Static
- E. Flexfield
Answer: D
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/applications-common/19b/facia/define-approval-management.html#FACIA3124477 Topic Approval Groups Each approval group includes a set of users that you configure to act on tasks in a certain pattern. Tasks can be defined to get routed to an approval group instead of an individual user. You can nest approval groups within approval groups.
You have two options for defining the group:
Static: Select the specific users to include in the group.
Dynamic: Provide the logic to use to determine the users in the group.
NEW QUESTION # 27
In a Project Draft Invoice preview, quantity (hours) and unit price (bill rate) are shown as fields on the invoice. Quantity and unit price are then used to calculate the line total, then the total price of the invoice. After the invoice is transferred or created in Receivables, the invoice detail has a quantity of 1, and a unit price equal to the line total. The detailed Unit Price/Quantity does not come through on the Receivables invoice.
Identify the correct statement about details in the receivables invoice. (Choose the best answer.)
- A. The project sends the invoice line description and the invoice distributions to Receivables, but not the invoice header.
- B. The project sends only the invoice header to Receivables, not the invoice line description and distributions.
- C. The project sends the invoice header, invoice line description, and the invoice distributions to Receivables.
- D. The project sends only the invoice header and invoice line description to Receivables, not the invoice distributions.
Answer: D
Explanation:
When a project invoice is transferred or created in Receivables, the project sends only the invoice header and invoice line description to Receivables, not the invoice distributions. The invoice distributions contain the detailed information such as quantity, unit price, and line total. Therefore, the Receivables invoice does not show these details, but only shows a quantity of 1 and a unit price equal to the line total. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-invoices.html#OAPFM2355931
NEW QUESTION # 28
Your client has implemented Oracle Cloud Applications with their United States business unit and United Kingdom business unit. After six months, they acquired another company in China and added a China business unit. A project accountant in your organization is authorized to access transactions for the US, UK, and China business units. The project accountant can see the transactions for the US and UK business units but not for the China business unit. Why is he not able to see the transactions for the China business unit? (Choose the best answer.)
- A. The JOB role relevant to the China business unit is not assigned to the project accountant.
- B. The project accountant is not assigned to the external role that grants access to the China business unit.
- C. The China business unit is associated with a different legal entity than the US and UK business units.
- D. The US and UK business units are linked to different ledgers than the China business unit.
Answer: B
Explanation:
To access transactions for a business unit, the project accountant needs to be assigned to an external role that grants access to that business unit. The external role is defined by the security profile of the business unit and can be different for each business unit. The job role and the legal entity are not relevant for accessing transactions for a business unit. The ledger is relevant for accounting transactions, but not for project transactions. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/set-up-project-financial-management.html#OAPFM2355903
NEW QUESTION # 29
When scheduling the Update Project Performance Data process to run on a periodic basis, which summarization method would you select? (Choose the best answer.)
- A. Detail
- B. Incremental
- C. Bulk
- D. Summary
Answer: B
Explanation:
Reference https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/define-project-organizations.html#OAPFM177674 Settings That Affect Performance Data Summarization You can summarize performance data for a project unit, business unit, a range of projects, or projects managed by a project manager. When you run the Update Project Performance Data process from the Scheduled Processes page, select one of the summarization methods from the following table:
Summarization Method
Usage
Incremental
Summarizes new transactions that are yet to be summarized
Delete and re-summarize
Correct summary data when the source system data changes outside the regular transaction flow.
Do not use this summarization method when you run the Update Project Performance Data Without Producing Report process unless you are advised to do so.
Resource breakdown structure
Migrate all summary data from one resource breakdown structure version to the next.
If you select this option, you must also specify the resource breakdown structure header.
NEW QUESTION # 30
Your customer has the following setups on the project plan type that they are using for their projects:
Use Task Planned Dates as Task Assignment Dates = Yes
Automatically Roll Up Task Planned Dates = Yes
Synchronize Task Transaction Dates with Planned Dates = No
With these setups in place, you perform the following actions:
1. Create a new subtask (Sub Task 1) with a start date of 15-Jun-2016 on the project that has as start date of 01-Jul-2016.
2. Create another new subtask (Sub Task 2) after the previous action is saved.
What would the correct behavior of the application be after these actions? (Choose the best answer.)
- A. After the creation and saving of Sub Task 1, Task Start Date would be changed to 01-Jul-2016 and Sub Task 2 would be created with 01-Jul-2016.
- B. After the creation of Sub Task 1, Project Start Date would remain unchanged as 01-Jul-2016 and Sub Task 2 would be created with 15-Jun-2016.
- C. Project Start Date would remain unchanged as 01-Jul-2016 for both actions but the start dates on both subtasks would remain 15-Jun-2016.
- D. After the creation of Sub Task 1, Project Start Date would be changed to 15-Jun-2016 and Sub Task 2 would be created with 15-Jun-2016.
Answer: D
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjf/manage-project-plan-tasks-and-task-assignments.html#OAPJF75076
NEW QUESTION # 31
You have been hired as a project manager for implementing the Project Financial Management and Project Execution Management offering by an organization. The Chief Information Officer of the deploying organization has requested you to explain the benefits of using the implementation project-based approach over the functional area-based approach.
Which two are the main benefits of using the implementation projects within Functional Setup Manager?
- A. Implementation Project helps you to monitor progress of the setup tasks.
- B. Implementation Project helps you to use the manage setup data entry in bulk option.
- C. Implementation Project helps in assigning responsibility of managing setup data to a broad group of users.
- D. Implementation Project gives you the flexibility to set up different functional areas of the offering at different times.
Answer: C
Explanation:
Some of the main benefits of using the implementation projects within Functional Setup Manager are:
Implementation Project helps in assigning responsibility of managing setup data to a broad group of users. You can assign tasks to different users who are responsible for entering and validating setup data for different functional areas of the offering.
Implementation Project helps you to monitor progress of the setup tasks. You can track the status and completion percentage of each task and view the dependencies and prerequisites among tasks. Implementation Project does not give you the flexibility to set up different functional areas of the offering at different times, as this is determined by the configuration package that you select for your implementation. Implementation Project does not help you to use the manage setup data entry in bulk option, as this is a separate feature that allows you to import and export setup data across instances using spreadsheets. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/implement-project-financial-management-applications.html#OAPFM2356051
NEW QUESTION # 32
Your organization has a requirement to create and apply a new theme for the application user interface.
Which option allows you to achieve this requirement?
- A. Setup and Maintenance Work Area
- B. Appearance Page
- C. Structure Page
- D. User Interface Text
Answer: D
Explanation:
The option that allows you to achieve this requirement is Appearance Page. This page allows you to create and apply a new theme for the application user interface by selecting various options such as colors, fonts, logos, etc. You can also preview and publish your theme changes using this page. Structure Page is not an option that allows you to achieve this requirement. This page allows you to customize the structure and layout of the application user interface by adding or removing components such as regions, tabs, fields, etc. Setup and Maintenance Work Area is not an option that allows you to achieve this requirement. This work area allows you to perform various setup tasks for implementing and configuring Oracle Fusion applications using predefined templates and spreadsheets. User Interface Text is not an option that allows you to achieve this requirement. This option allows you to customize the text and labels of the application user interface by editing or translating them using various tools such as Text Editor or Translation Workbench. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/set-up-project-financial-management.html#OAPFM2356331
NEW QUESTION # 33
Identify three correct statements about project types. (Choose three.)
- A. Project type can be associated with multiple project units.
- B. Summarization options can be specified at project type.
- C. Classifications can be assigned at project type.
- D. Project type can be enabled for both billing and capitalization.
- E. Project type can be used as a source in subledger accounting.
Answer: D
Explanation:
Project type is a classification that defines the common attributes and processing options for projects. Some of the correct statements about project type are:
Project type can be used as a source in subledger accounting. This allows you to create accounting rules based on the project type attribute.
Summarization options can be specified at project type. This allows you to control how the project transactions are summarized for reporting and performance purposes.
Project type can be associated with multiple project units. This allows you to share the same project type across different business units or organizations. Project type cannot be enabled for both billing and capitalization, as these are mutually exclusive options. Classifications cannot be assigned at project type, but at project or task level. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/set-up-project-financial-management.html#OAPFM2355971
NEW QUESTION # 34
Which precedence order is used by the system for labor schedules to distribute payroll cost?
- A. Assignment > Assignment Element > Element
- B. Assignment Element > Element > Assignment
- C. Element > Assignment Element > Assignment
- D. Assignment > Element > Assignment Element
Answer: A
Explanation:
The precedence order that is used by the system for labor schedules to distribute payroll cost is Assignment > Assignment Element > Element. This means that the system first looks for a labor schedule that is assigned to the employee assignment, then for a labor schedule that is assigned to the payroll element of the employee assignment, and finally for a labor schedule that is assigned to the payroll element itself. The system uses the first labor schedule that it finds in this order to distribute the payroll cost to projects and tasks based on the hours and rates defined in the schedule. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-costs.html#OAPFM2356121
NEW QUESTION # 35
Your customer wants a team member who is assigned to a project to be able to create and submit a forecast, but not to be able to approve the forecast. What is the default project role that you should assign to the person in the project to meet this requirement? (Choose the best answer.)
- A. Project Administrator
- B. Project Accountant
- C. Project Application Administrator
- D. Project Manager
Answer: D
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjm/project-administrator-job-role.html#Project_Administrator_privileges Project Manager has duty role 'Project Forecast Approval Duty' assigned but Project Administrator has duty role 'Project Forecast Inquiry Duty' - no approval authority Both roles have duty role 'Project Forecast Management Duty' which enables them to Allow creation, submission, update, and deletion of working versions of project forecasts. (Cloud _Roles_Duties.xlsx)
NEW QUESTION # 36
Which application would you use to map application roles to external roles? (Choose the best answer.)
- A. Security Console
- B. Authorization Policy Manager
- C. Oracle Identify Manager
- D. BPM Work List
Answer: C
Explanation:
Ref: https://docs.oracle.com/cd/E17904_01/doc.1111/e14431/managing.htm#APMAG3333 Fusion Middleware Administrator,s Guide for Authorization Policy Manager Managing Security Artifacts This chapter describes the procedures an administrator follows to manage application-specific security artifacts, view the external role hierarchy, manage the application role hierarchy, and manage the many-to-many mapping of application roles to external roles from both the application and the external role point of view.
This chapter is divided into the following sections:
Managing Application Security Artifacts
Viewing the External Role Hierarchy
Managing the Application Role Hierarchy
Mapping Application Roles to an External Role
Mapping External Roles to an Application Role
Role Mapping Policy
A Role Mapping Policy is used to determine what external subjects (users, groups or External Roles) are assigned to the applicable Application Role. The Application Role, when referenced in an Authorization Policy, defines the principals affected by the Authorization Policy. Role Mapping Policies may also include conditions Oracle Identity Manager - Not used for mapping application roles to external roles How do Users Interact with Oracle Identity Manager?
Oracle Identity Manager provides an end-user interface, called the Identity Self Service console, and a system administrator interface, called the Identity System Administration console. Both end-users and system administrators use the web browser to log on to Oracle Identity Manager. Oracle Identity Manager (OIM) OIM provision users, roles, and defines what a user can do in Oracle Cloud Duty Roles are mapped to jobs and assigned access privileges (Data Security)
NEW QUESTION # 37
Your customer wants to automatically allocate unassigned asset lines and common costs across multiple assets based on the construction-in-process cost of each asset.
Identify the asset allocation method that you must use as the default method while configuring project types to meet this requirement.
(Choose the best answer.)
Response:
- A. Actual Unit
- B. Estimated Cost
- C. Spread Evenly
- D. Current Cost
- E. Standard Unit Cost
Answer: C
NEW QUESTION # 38
Identify two correct role templates available on the Oracle Entitlement Server to generate roles for Project Organization Security.
- A. Project Accountant Template for Project Organization Security
- B. Project Billing Specialist Template for Project Organization Security
- C. Project Creator Template for Project Organization Security
- D. Project Manager Template for Project Organization Security
- E. Project Administrator Template for Project Organization Security
Answer: E
Explanation:
Reference https://docs.oracle.com/en/cloud/saas/applications-common/r13-update17d/faser/implementing-security-in-oracle-fusion-project-portfolio-management.html#FASER1722595 Ref to "Securing Project Financial Management and Grants Management Applications" Table lists predefined enterprise roles and the type of security that grants the role access to data in a work area or dashboard.
Enterprise Role
Work Area or Dashboard
Data Security Based On
Project Accountant
Asset
Project business unit
Project Accountant
Costs
Project expenditure business unit
Project Accountant
Revenue
Contract business unit
Project Administrator
Project Financial Management
Project business unit
Project organization
Project Billing Specialist
Invoices
Contract business unit
Project Creator
Project Financial Management
Project business unit
Project organization
Project Management Duty
Project Management Infolet Dashboard
Project assignment
Project Management Duty
Project Performance Dashboard
Project assignment
Project Manager
Project Management Infolet Dashboard
Project assignment
Project Manager
Project Performance Dashboard
Project assignment
Project Manager
Project Management
Project assignment
Project Manager
Project Manager Dashboard
Project assignment
Project Team Member
Project Financial Management
Project assignment
Grants Accountant
Invoices
Contract business unit
Grants Accountant
Revenue
Contract business unit
Grants Administrator
Awards
Contract business unit
Grants Administrator
Contracts
Contract business unit
Grants Administrator
Project Financial Management
Project business unit
Principal Investigator
Awards
Award assignment
Principal Investigator
Contracts
Award assignment
Principal Investigator
Project Financial Management
Project assignment
NEW QUESTION # 39
Your organization has been awarded a new contract based on which you are allowed to sell:
Items not tracked in inventory
Inventory items
Services
Which contract structure would fulfill your requirement of item sales? (Choose the best answer.)
- A. Create two contract lines with a line type each of "sell intent, free-form, project-based" and "sell intent, item, project-based".
- B. Create two contract lines with a line type each of "product, project-based, sell agreement, standalone" and "sell intent, item, project-based".
- C. Create two contract lines with a line type each of "sell intent, item, project-based' and "subscription, project-based, sell".
- D. Create two contract lines with a line type each of "free-form, project-based buy agreement" and "bundle sell, project-based".
Answer: C
Explanation:
To sell items not tracked in inventory, inventory items, and services, you can create two contract lines with different line types. The line type of "sell intent, free-form, project-based" allows you to sell any item or service without specifying the item number or quantity. The line type of "sell intent, item, project-based" allows you to sell inventory items by specifying the item number and quantity. Both line types are project-based, meaning they are linked to a project and generate revenue based on project performance. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-contracts.html#OAPFM2355835
NEW QUESTION # 40
......