SAP C-TS422-2020 exam is a certification test designed to evaluate the knowledge and skills of individuals looking to become SAP Certified Application Associates in SAP S/4HANA Production Planning and Manufacturing. C-TS422-2020 exam is intended for professionals who have experience in SAP PP and SAP MM modules, as well as those who want to prove their knowledge in SAP S/4HANA production planning and manufacturing processes.

 

NEW QUESTION # 77
Where do you maintain the duration of a producton operation?

  • A. Routing
  • B. Work instructions
  • C. Material master
  • D. Bill of material (BOM)

Answer: A


NEW QUESTION # 78
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

  • A. Creation of dependent requirements
  • B. Change of the storage bin
  • C. Change of the material'sprocurement type
  • D. Creation of a sales order
  • E. Creation of a purchasing contract

Answer: A,C,D


NEW QUESTION # 79
Your client is asking for your advice on material master numbering in SAP S/4HANA.
What do you need to consider? Note: There are 2 correct answers to this question.

  • A. The number of leading zeros for internal numbers is client-specific.
  • B. The display template for material numbers applies to all clients.
  • C. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • D. In Customizing you can decide by material type whether to use the long material number.

Answer: B,C


NEW QUESTION # 80
In the first step, you have created master recipes. In which sequence are the additional objects created?

  • A. Process order Control recipe Process message PI sheet
  • B. Control recipe Process order Process message PI sheet
  • C. Control recipe Process order PI sheet Process message
  • D. Process order Control recipe PI sheet Process message

Answer: D


NEW QUESTION # 81
How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.

  • A. Using purchase orders for external procurement
  • B. Using purchasing costs for automated source prioritization
  • C. Using stock transfer reservations for stock transfer
  • D. Using run schedule quantities for in-house production
  • E. Using quotations for internal and external procurement

Answer: A,C,D


NEW QUESTION # 82
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.

  • A. At order confirmation
  • B. At order creation
  • C. At order settlement
  • D. At order release

Answer: B,D


NEW QUESTION # 83
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

  • A. It is used in MRP to determine the sequence in which materials are planned.
  • B. It is used by ATP to determine the priority of alternative components.
  • C. It is used by product costing to determine how costs are rolled up.
  • D. It is used by engineering to identify sub items in an engineering bill of material(BOM).

Answer: A,C


NEW QUESTION # 84
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the item category of the phantom assembly in the BOM.
  • B. Change the phantom item indicator for the phantom assembly in the BOM.
  • C. Change the explosion type of the phantom assembly in the BOM.
  • D. Change the special procurement key of the phantom assembly in the BOM.

Answer: C


NEW QUESTION # 85
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?

  • A. Use a propagation range.
  • B. Use a heuristic.
  • C. Use a planning group.
  • D. Use a resource group.

Answer: B


NEW QUESTION # 86
What are prerequisites for using batch derivation? There are 2 correct answers to this question.

  • A. Batch where-used list
  • B. Batch determination selection conditions
  • C. Receiver-sender relationships
  • D. Process instructions

Answer: A,C


NEW QUESTION # 87
Which of the following time elements does MRP use during backward scheduling for in-house production?
There are 2 correct answers to this question.

  • A. Planned delivery time
  • B. Opening period
  • C. Goods receipt processing time
  • D. Planning time fence

Answer: B,C


NEW QUESTION # 88
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The most restrictive status
  • B. The plant-specific status
  • C. The least restrictive status
  • D. The cross-plant status

Answer: A


NEW QUESTION # 89
What are some of the advantages of using Kanban? There are 2 correct answers to this question.

  • A. Replenishments are created close to the actual need
  • B. It is a simplified form of production control
  • C. Replenishments are based on centralized planning
  • D. It is mostly accomplished by manual postings

Answer: A,B


NEW QUESTION # 90
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • B. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • C. The lot size range must be within the lot-size range of the assigned routing.
  • D. The assigned routing must be a rate routing.
  • E. The assigned routing must NOT have alternative sequences.

Answer: A,B,C


NEW QUESTION # 91
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.

  • A. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
  • B. Manually firm all planned orders for materials within the replenishment lead time of the material
  • C. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
  • D. In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material

Answer: A,B


NEW QUESTION # 92
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple operations are maintained for one product
  • B. When multiple planned orders exists in one resource
  • C. When multiple production versions are maintained for one product
  • D. When alternate resourcesare used within one operation

Answer: D


NEW QUESTION # 93
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Validity period or sales order
  • B. Planned order or materialnumber
  • C. Alphanumeric or quota arrangement
  • D. Lot size or material cost

Answer: C


NEW QUESTION # 94
Which task list types can have parallel sequences? There are 2 correct answers to this question.

  • A. Master recipes (2)
  • B. Routings (N)
  • C. Reference operation sets (S)
  • D. Rate routings (R)

Answer: B,D


NEW QUESTION # 95
What are pillars of SAP Activate?
There are 2 correct answers to this question.

  • A. SAP MaxAttention
  • B. Premium engagement
  • C. SAP Best Practices
  • D. Guided Configuration

Answer: C,D


NEW QUESTION # 96
What are properties of MRP Live? There are 2 correct answers to this question.

  • A. Data is read sequentially from the database tables
  • B. It uses the same BAdis as classic MRP
  • C. It is executed on the database server
  • D. The code is written in SQL Script

Answer: C,D


NEW QUESTION # 97
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Item type
  • B. Scrap percentage
  • C. Installation point
  • D. Quantity

Answer: C,D


NEW QUESTION # 98
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Net requirements calculation is sales order-specific.
  • B. Sales order-specific stock is created
  • C. Storage location MRP areas are required.
  • D. Sales order-specific planning run is required.
  • E. Production orders are created with sales order reference.

Answer: A,B,E


NEW QUESTION # 99
......